Regular Meeting #06-20
An Informational Session was called to order at 7:30 p.m. by Vice Chairman John Himmelman. It became a Regular Meeting when a quorum was present at 7:50 p.m.
Members present: W. Addy (arrived at 7:50), J. Himmelman, R. Tanko
Also present: Enforcement Officer C. Jefferson
Members absent: T. Doyle, R. White, G. Rockwell
Visitors: Roger Nemergut, Deborah Moore, Kim and Jeremy Adametz, Walter and Cindy Adametz
Engineer Roger Nemergut gave an update on the Patrick Drive back lot for which a permit was granted under the agreement with the neighboring Lot 10 owner that part of the driveway would be shared. The Lot 10 owner has now decided that he does not want to follow through with that agreement. Mr. Nemergut will submit a revised plan that will be an amendment to the original permit.
Deborah Moore explained to commission members her proposal for a driveway, pool and new patio area on their property at 100 Buell Hill Road. When they purchased their property, the regulated area was 50’ from the wetlands; it is now 100’, which means most of their backyard is now a regulated area. Mrs. Moore would like to start some of the project before winter. Members agreed that she can put in the driveway, the patio and the sod. Because the area was disturbed when the house was built, finishing that portion of the property will help to stabilize it.
Minutes: The minutes of the October 10, 2006 Regular Meeting were approved by a consensus of
the members.
Enforcement Officer’s Report: Cathie Jefferson reported on the following:
She will be present at a site walk of the new middle school property with the Town Engineer on October 26th to determine what still needs to be completed to comply with their permit.
She retyped the IWWC application form to include notification of the water company.
She has not been informed yet of the date of the Lovers Lane ERT
The USDANRCS maps have been redone. All soils names & classifications have been changed.
Three Request for Reviews were submitted since the last meeting.
OLD BUSINESS
A. W. & M. Adametz (owner), J. Adametz (applicant) permit application for driveway –
187 Schnoor Road
Engineer Roger Nemergut submitted the certificates of mailing from the notice that was sent to adjoining/abutting property owners about the Adametz proposal. He explained that he had explored other options for the driveway to minimize the impact to the wetlands. This lot and the adjoining lot owned by Walter Adametz have to have 200’ of frontage for the lots to be approved by P&Z. The revised plan shows a common driveway for part of the length of the driveway that will access the back lot.
J. Himmelman moved, seconded by R. Tanko to grant a permit to Walter J. Adametz, Jr. and Mary F. Adametz (owners), Jeremy Adametz (applicant), for a new driveway for Lot 2, and a driveway expansion of the existing driveway to the proposed new house, as shown on the plan, “Site Plan & Erosion and Sediment Control Plan”, Map 11, Lot 13, prepared for Jeremy Adametz, dated October 5, 2006, revised October 24, 2006. The motion carried unanimously.
NEW BUSINESS
A. Discussion of possible Killingworth IWWC Regulations changes
Discussion was tabled until the next meeting. Chairman Addy will email his comments on the Regulations to the members for their review before the next meeting.
B. Communications
Letter from Sue Davenport, 10/20/06, re: Lovers Lane
Memo from John McMahon, Chairman, Board of Finance, 10/13/06, re: Annual Report request
Copy of letter from Cathie S. Jefferson to Gary Mala, 10/12/06, re: request for site inspection of new middle school
Minutes of October 3, 2006 Special Meeting of Board of Selectmen
Minutes of October 10, 2006 Regular Meeting of Board of Selectmen
Notice of Vote from October 10, 2006 Regular Meeting of Board of Selectmen
Memo from Wayne Addy to P&Z Commission, 10/12/06, re: Village East commercial subdivision
Site Plan & Erosion & Sediment Control Plan prepared for Jeremy Adametz, 10/5/06, revised 10/24/06
Copy of letter from R.E. Leighton, Code Official, to Edward J. Coppola, P.E., 10/15/06, re: Village East Subdivision Septic System Review
Copy of memo from R.E. Leighton, Code Official, to Killingworth P&Z Commission, 10/15/06, re: Village East Subdivision Fire Protection Review & Approval
Copy of memo from R.E. Leighton, Code Official, to P&Z Commission, 10/15/06, re: Land of Richter (Torres & Anderson) Fire Protection Review
Copy of memo from R. E. Leighton, Code Official, to Killingworth P&Z Commission, 10/15/06, re: Land of Richter (Torres & Anderson) Sanitarian’s Review
Copy of memo from R.E. Leighton, Code Official, to James Foote, Industrial Construction Co., 10/18/06, re: RSD #17 New Intermediate/Middle School project – emergency access roadway
Copy of letter from R.E. Leighton, Code Official, to State of CT, Dept. of Public Health, Robert W. Scully, P.E. Sanitary Engineer III, 10/21/06, re: Village East Subdivision Septic System Review
Certified mail receipts (20) from notice to adjoining/abutting property owners to Adametz property
C. Request for Review forms
39 Kelseytown Road – garage
106 Roast Meat Hill Road - addition
Adjournment
The meeting adjourned at 8:16 p.m.
Members present: W. Addy (arrived at 7:50), J. Himmelman, R. Tanko
Also present: Enforcement Officer C. Jefferson
Members absent: T. Doyle, R. White, G. Rockwell
Visitors: Roger Nemergut, Deborah Moore, Kim and Jeremy Adametz, Walter and Cindy Adametz
Engineer Roger Nemergut gave an update on the Patrick Drive back lot for which a permit was granted under the agreement with the neighboring Lot 10 owner that part of the driveway would be shared. The Lot 10 owner has now decided that he does not want to follow through with that agreement. Mr. Nemergut will submit a revised plan that will be an amendment to the original permit.
Deborah Moore explained to commission members her proposal for a driveway, pool and new patio area on their property at 100 Buell Hill Road. When they purchased their property, the regulated area was 50’ from the wetlands; it is now 100’, which means most of their backyard is now a regulated area. Mrs. Moore would like to start some of the project before winter. Members agreed that she can put in the driveway, the patio and the sod. Because the area was disturbed when the house was built, finishing that portion of the property will help to stabilize it.
Minutes: The minutes of the October 10, 2006 Regular Meeting were approved by a consensus of
the members.
Enforcement Officer’s Report: Cathie Jefferson reported on the following:
She will be present at a site walk of the new middle school property with the Town Engineer on October 26th to determine what still needs to be completed to comply with their permit.
She retyped the IWWC application form to include notification of the water company.
She has not been informed yet of the date of the Lovers Lane ERT
The USDANRCS maps have been redone. All soils names & classifications have been changed.
Three Request for Reviews were submitted since the last meeting.
OLD BUSINESS
A. W. & M. Adametz (owner), J. Adametz (applicant) permit application for driveway –
187 Schnoor Road
Engineer Roger Nemergut submitted the certificates of mailing from the notice that was sent to adjoining/abutting property owners about the Adametz proposal. He explained that he had explored other options for the driveway to minimize the impact to the wetlands. This lot and the adjoining lot owned by Walter Adametz have to have 200’ of frontage for the lots to be approved by P&Z. The revised plan shows a common driveway for part of the length of the driveway that will access the back lot.
J. Himmelman moved, seconded by R. Tanko to grant a permit to Walter J. Adametz, Jr. and Mary F. Adametz (owners), Jeremy Adametz (applicant), for a new driveway for Lot 2, and a driveway expansion of the existing driveway to the proposed new house, as shown on the plan, “Site Plan & Erosion and Sediment Control Plan”, Map 11, Lot 13, prepared for Jeremy Adametz, dated October 5, 2006, revised October 24, 2006. The motion carried unanimously.
NEW BUSINESS
A. Discussion of possible Killingworth IWWC Regulations changes
Discussion was tabled until the next meeting. Chairman Addy will email his comments on the Regulations to the members for their review before the next meeting.
B. Communications
Letter from Sue Davenport, 10/20/06, re: Lovers Lane
Memo from John McMahon, Chairman, Board of Finance, 10/13/06, re: Annual Report request
Copy of letter from Cathie S. Jefferson to Gary Mala, 10/12/06, re: request for site inspection of new middle school
Minutes of October 3, 2006 Special Meeting of Board of Selectmen
Minutes of October 10, 2006 Regular Meeting of Board of Selectmen
Notice of Vote from October 10, 2006 Regular Meeting of Board of Selectmen
Memo from Wayne Addy to P&Z Commission, 10/12/06, re: Village East commercial subdivision
Site Plan & Erosion & Sediment Control Plan prepared for Jeremy Adametz, 10/5/06, revised 10/24/06
Copy of letter from R.E. Leighton, Code Official, to Edward J. Coppola, P.E., 10/15/06, re: Village East Subdivision Septic System Review
Copy of memo from R.E. Leighton, Code Official, to Killingworth P&Z Commission, 10/15/06, re: Village East Subdivision Fire Protection Review & Approval
Copy of memo from R.E. Leighton, Code Official, to P&Z Commission, 10/15/06, re: Land of Richter (Torres & Anderson) Fire Protection Review
Copy of memo from R. E. Leighton, Code Official, to Killingworth P&Z Commission, 10/15/06, re: Land of Richter (Torres & Anderson) Sanitarian’s Review
Copy of memo from R.E. Leighton, Code Official, to James Foote, Industrial Construction Co., 10/18/06, re: RSD #17 New Intermediate/Middle School project – emergency access roadway
Copy of letter from R.E. Leighton, Code Official, to State of CT, Dept. of Public Health, Robert W. Scully, P.E. Sanitary Engineer III, 10/21/06, re: Village East Subdivision Septic System Review
Certified mail receipts (20) from notice to adjoining/abutting property owners to Adametz property
C. Request for Review forms
39 Kelseytown Road – garage
106 Roast Meat Hill Road - addition
Adjournment
The meeting adjourned at 8:16 p.m.
